Energy & Renewables

Energy & Renewables

Hydropower, Solar, and Power Transmission & Distribution

We provide end-to-end solutions for power and infrastructure projects, ensuring quality, compliance, and efficiency at every stage.

We have worked with World renowned developers, investors, engineering firms, contractors and equipment vendors in the engineering, construction and supply of major HYDRO POWER and ELECTRIC TRANSMISSION, DISTRIBUTION and SUBSTATION PROJECTS in Nepal. We have been involved in many of the government’s generation plants and transmission systems.

Our well acknowledged services have extended to all major public undertakings and also include Nepal’s first Independent Power Producer.

Services and Expertise

  • Project identification

  • Licensing and Approvals

  • Feasibility, Design, ESIA, Supervision

  • EPC/Turnkey Civil, HM & EM Works

  • Transmission Lines & Substations

  • Distribution Systems & Equipment

  • SCADA & Telemetry

  • Operation and Maintenance (O&M)

  • Strategic local partnership

  • Sourcing of Funds

  • Power Plant Development (Hydro, Solar)

Project Illustrations

111 MW Rasuwagadhi Hydroelectric Project

EPC contract for Civil Works and Hydromechanical Works for 111 MW Rasuwagadhi Hydro Electric Project

EPC contract for Civil Works and Hydromechanical Works for 111 MW Rasuwagadhi Hydro Electric Project

Hydro Electric Project 111 MW Rasuwagadhi HEP

Hydro Electric Project 111 MW Rasuwagadhi HEP

102 MW Middle Bhotekoshi Hydroelectric Project

102 MW Middle Bhotekoshi Hydroelectric Project

102 MW Middle Bhotekoshi Hydroelectric Project

132kV TL Tower for 30MW Chameliya HEP

Substation and 132kV Transmission Line Tower for 30MW Chameliya HEP

Substation and 132kV Transmission Line Tower for 30MW Chameliya HEP

132kV Substation at Kohalpur

132kV Substation at Kohalpur

132kV Substation at Kohalpur

132kV Butwal-Nepalgunj Transmission Line

132kV Butwal-Nepalgunj Transmission Line

132kV Butwal-Nepalgunj Transmission Line

132kV Substation at Chandranigahpur

132kV Substation at Chandranigahpur

132kV Substation at Chandranigahpur

132kV Upper Trisuli-Kathmandu TL

Upper Trishuli 3A, 220kV Transmission Line

Upper Trishuli 3A, 220kV Transmission Line

132kV Dumkibas-Butwal TL & SS

Dumkibas High Voltage Substation

Dumkibas High Voltage Substation

132kV Nepalgunj-Mahendranagar TL & SS

132kV Transmission Line: Nepalgunj-Mahendranagar

132kV Transmission Line: Nepalgunj-Mahendranagar

140 MW Tanahu Storage Hydroelectric Project

140 MW Tanahu Storage Hydroelectric Project Project Management

140 MW Tanahu Storage Hydroelectric Project Project Management

144 MW Kali Gandaki A HEP

132kv Transmission Lines and Substation Lot-7 KGA HEP

132kv Transmission Lines and Substation Lot-7 KGA HEP

144 MW Kali Gandaki A HEP Powerhouse View

144 MW Kali Gandaki A HEP Powerhouse View

144mw KGA HEP Electrical Equipment Rotor Assembly

144mw KGA HEP Electrical Equipment Rotor Assembly

144mw KGA HEP Embedding Hydraulic Steel Structures

144mw KGA HEP Embedding Hydraulic Steel Structures

Draft Tube Installation 144mw KGA HEP Lot-4 HSS

Draft Tube Installation 144mw KGA HEP Lot-4 HSS

Electrical Equipment Control Panel at 144mw KGA HEP

Electrical Equipment Control Panel at 144mw KGA HEP

Electrical Equipment Generator Assembly at 144 MW KGA HEP

Electrical Equipment Generator Assembly at 144 MW KGA HEP

Hydraulic Steel Structures and Systems 144mw Kali Gandaki A HEP

Hydraulic Steel Structures and Systems 144mw Kali Gandaki A HEP

Hydromechanical Equipment for Kali Gandaki A Hydroelectric Project

Hydromechanical Equipment for Kali Gandaki A Hydroelectric Project

Mechanical and Electrical Equipment KGA HEP

Mechanical and Electrical Equipment KGA HEP

Runner (Turbine) of 144 MW KGA HEP

Runner (Turbine) of 144 MW KGA HEP

14 MW Modi-Khola HEP

14 MW Modi-Khola HEP Powerhouse

14 MW Modi-Khola HEP Powerhouse

220kV Khimti-Dhalkebar Transmission Line

Nepal's First 220kV Transmission Line Khimti-Dhalkebar

Nepal's First 220kV Transmission Line Khimti-Dhalkebar

220kV Koshi Corridor Transmission Line

Koshi Corridor 220kV Transmission Line

Koshi Corridor 220kV Transmission Line

22.5 MW Rolwaling Diversion Project

Rolwaling Diversion Project Detailed Design

Rolwaling Diversion Project Detailed Design

30 MW Chameliya HEP

Electromechanical & Hydromechanical Equipment 30 MW Chameliya HEP

Electromechanical & Hydromechanical Equipment 30 MW Chameliya HEP

Hydromechanical Equipment Penstock Steel Liner 30mw Chameliya HEP

Hydromechanical Equipment Penstock Steel Liner 30mw Chameliya HEP

Substation and 132kV Transmission Line Tower 30mW Chameliya HEP

Substation and 132kV Transmission Line Tower 30mW Chameliya HEP

Turnkey Contract for Chameliya HPP

Turnkey Contract for Chameliya HPP

402 MW Arun-3 Hydroelectric Project

Arun-3 HEP Feasibility Study and Detailed Design

Arun-3 HEP Feasibility Study and Detailed Design

402mw Arun-3 Hydroelectric Project Model Testing

402mw Arun-3 Hydroelectric Project Model Testing

456 MW Upper Tamakoshi Hydroelectric Project

Upper Tamakoshi HEP Construction Stage

Upper Tamakoshi HEP Construction Stage

456mw Upper Tamakoshi Hydroelectric Project

456mw Upper Tamakoshi Hydroelectric Project

60 MW Khimti-I HEP

60mw Khimti-1 First Major IPP in Nepal

60mw Khimti-1 First Major IPP in Nepal

Nepal's 1st Private Sector Hydropower Project Khimti-I

Nepal's 1st Private Sector Hydropower Project Khimti-I

69 MW Lower Marsyangdi Hydroelectric Project

69mw Lower Marsyangdi Hydroelectric Project LMHEP

69mw Lower Marsyangdi Hydroelectric Project LMHEP

Control Panel at 69mw LMHEP

Control Panel at 69mw LMHEP

Rectification of Penstock Trifurcation at 69mw LMHEP

Rectification of Penstock Trifurcation at 69mw LMHEP

Hydraulic Steel Structures and Systems LMHEP

Hydraulic Steel Structures and Systems LMHEP

Intake Valve at 69mw Lower Marsyandi HEP

Intake Valve at 69mw Lower Marsyandi HEP

72 MW Middle Marsyangdi Hydroelectric Project

72mw Middle Marsyangdi Hydroelectric Project MMHEP

72mw Middle Marsyangdi Hydroelectric Project MMHEP

MMHEP Second Largest Hydropower Project in Nepal 2020

MMHEP Second Largest Hydropower Project in Nepal 2020

MMHEP Turnkey Contract for Electrical Equipment

MMHEP Turnkey Contract for Electrical Equipment

MMHEP Turnkey Contract for Mechanical Equipment

MMHEP Turnkey Contract for Mechanical Equipment

72mw MMHEP Francis Turbines Model Testing

72mw MMHEP Francis Turbines Model Testing

750 MW West Seti Storage Hydroelectric Project

Development of 750 MW West Seti Storage HEP

Development of 750 MW West Seti Storage HEP

900 MW Upper Karnali Hydroelectric Project

Development of 900 MW Upper Karnali HEP

Development of 900 MW Upper Karnali HEP

Tamakoshi-V Hydroelectric Project

99.8 MW Tamakoshi-V Hydroelectric Project Detailed Design

99.8 MW Tamakoshi-V Hydroelectric Project Detailed Design

512 MW Bharbung Storage Hydroelectric Project

512 MW Bharbung Storage HEP Feasibility and EIA Study

512 MW Bharbung Storage HEP Feasibility and EIA Study

62 MW Humla Karnali Hydroelectric Project

62mw Humla Karnali HEP Feasibility and EIA Study

62mw Humla Karnali HEP Feasibility and EIA Study

Kulekhani Storage Hydropower Station

32 MW Kulekhani-II Storage Hydropower Station Emergency Restoration

32 MW Kulekhani-II Storage Hydropower Station Emergency Restoration

Our Experiences

Some of the Hydropower (HEPP) and Transmission Line (TRL) Projects, in which ICTC Group was involved* as Strategic Local Partner to International Firms executing the Projects:

YearProject NameDescription / Scope
1980-199669 MW Marsyangdi HEPCivil Works, Hydraulic Steel Structures, Hydromechanical Equipment, Training, including sourcing of fund
1992Trishuli HEPRehab Works
1992-1995402 MW Arun-3 HEPFeasibility Study, Detailed Engineering Design.
1993Kulekhani Storage HEPEmergency Rehab Civil Works
199660 MW Khimti I HEPElectromechanical Equipment.
1997-2004144 MW Kali Gandaki A HEPHydraulic Steel Structures, Hydromechanical and Electromechanical Equipment, Transmission Line and Substations, Operation and Maintenance.
2000 & 200527 MW Khimti II HEPFeasibility Study and Survey License.
2001-200872 MW Marsyangdi HEPCivil Works, Hydraulic Steel Structures, Hydromechanical and Electromechanical Equipment, including sourcing of funds.
2007-202230 MW Chameliya HEPHydromechanical and Electromechanical Equipment, Transmission Line and Substations, including arrangement of sourcing of funds.
2011-2018750MW West Seti StorageInvestment (License)
2007-Ongoing900 MW Upper Karnali HEPComplete Project cycle including Project Development and License through competitive bidding.
2004-2022456 MW Upper Tamakoshi HEPFeasibility Study, Detailed Design and Construction Supervision.
2016-2022140 MW Tanahu HEPPConsulting (Supervision)
N/A250 MW Upper Arun HEPEngineering Works.
N/A14 MW Modi KholaElectromechanical Equipment
2016-2025111 MW Rasuwagadhi HEPCivil Works and HM EPC
2016-2022101 MW Mid-Bhotekoshi HEPConsulting (Supervision)
2016-201887-100 MW Tamakoshi VConsulting (Design)
2016-201822.5 MW RolwalingConsulting (Design)
2020-2024Humla-Karnali (62 MW)Feasibility & EIA Study
2020-2026Bharbhung Storage (512MW)Feasibility & EIA Study
2020-2024Tatu ROR Project (10 MW)Feasibility & EIA Study
2016-2018186MW Tamakoshi-3ESIA + Feasibility Study
2016-2018186MW Tamakoshi-3 (Power Access)Power Access Study
1983132 KV Dumkibas – Butwal TL and SSConstruction/Rehab works as local associate.
1984132 KV Kulekhani – Kathmandu TLTransmission Line construction works.
1984, 1987132 KV Butwal – Nepalgunj TLConstruction and installation of transmission lines.
1989, 1991132 KV Nepalgunj – Mahendranagar TL and SSConstruction of Transmission Lines and Substations.
1990sKarnali (Transmission) NetworkRehab of Karnali (Transmission) Network
1990s132kV Hetauda – Gandak TRLConstruction/Engineering Study associate.
1990s132kV Kulekhani II – Kathmandu TRLTransmission line construction involvement.
199066 KV Dipayal – Atarriya TLConstruction of 66 KV transmission line.
1996132 KV Khimti – Bhaktapur TLInvolvement as local associates of Contractors/Suppliers.
1998132 KV Kali Gandaki – Pokhara – Kathmandu TLPower Transmission Line construction.
2006220 KV Khimti – Dhalkebar TLTransmission Line project involvement.
2006132 KV Chandranigapur SSSubstation construction project.
2008132kV Chameliya - Attariya TRL+SSTransmission Line and Substation Construction.
2011132 KV Butwal – Kohalpur SSConstruction of Substation.
2011132 KV Upper Trisuli – Kathmandu TLConstruction of Transmission Line.
2018220 kV Tamakoshi-Kirne TRLPower Transmission Line project.
2018220 kV Butwal-Kohalpur 2nd Ckt TRLPower Transmission Line Construction.
2021220 kV Koshi Corridor TRLMajor Transmission Corridor construction.
N/ANationwide Hydropower MasterPlan EngineeringEngineering Study Involvement.
N/ANEA – Twinning & Corporate PlanningConsultancy and Study Services.
N/ANEA – Design & Implementation of NEA Training FacilitiesConsultancy for institutional development.
N/ANEA – Long Run Marginal StudyEngineering and Economic Study.
N/ANEA – Transmission Line Master PlanStrategic Engineering Study.
N/ANEA – Generation Master Plan, Distribution Master PlanComprehensive Power Sector Planning Study.
N/ANEA – Transmission Line Consulting ServicesTechnical consulting services.
N/ANEA – Feasibility of Chilime-Trishuli TRL 132kVEngineering Feasibility Study.

* Involvement as local associates of Consultants, Contractors and Plant Suppliers

Interested ?

Let's discuss how we can help bring your project to life with our expertise and experience.